PRODUCTS
新闻资讯
- 隧道施工新利器:钻锚注一体机如何重塑锚杆钻机作业标准?
- 锚杆钻机智能化转型纪实
- 煤矿巷道支护升级:新型锚杆钻机如何破解“掘支失衡”难题?
- 软基处理新选择,高压旋喷钻机在道路加固中的应用
- 老旧设备升级改造,高压旋喷钻机如何适应新工况
联系我们
电话:0510-83208848
邮箱:1301666944@qq.com
地址:X306, Huishan District, Wuxi City, Jiangsu Province
ZG7260-0 60 double drill bit
The 60 double drill bit is installed at the lowest end of the drill pipe. The top of the drill bit is inlaid with alloy to facilitate the drilling of the drill pipe. Two nozzles are installed on both sides of the cylinder of the drill bit. The diameter of the nozzles is between 1.6~3.0mm. Annular gas nozzles are installed around the nozzles to ensure the coaxial injection of slurry and gas. After some soft geological structures are emptied to the bottom, it is not necessary to replace the drill bit, and the rotary jet can be slowly lifted to improve the work efficiency.





客服QQ